Northstave

Free tool · new construction

Warranty deadline calculator

Pick a closing date and a common warranty shape. We show the 1-, 2-, and 10-year expiry dates plus the 11-month and 23-month walkthrough targets — then you can download a calendar file or print a checklist. Runs entirely in your browser on northstave.app. Nothing is uploaded.

Warranty template

Your dates

Closing February 15, 2026. Confirm every date against your builder's packet — templates vary.

1-year workmanship ends
February 15, 2027
2-year systems ends
February 15, 2028
10-year structure ends
February 15, 2036
11-month walkthrough
January 15, 2027
23-month check-in
January 15, 2028
Email me when Closeout launches

11-month walkthrough checklist

Walk the house about a month before the 1-year workmanship window ends (target January 15, 2027). Mark defects while they're still covered.

  • Exterior: siding, trim, caulk, grading, drainage
  • Roof and gutters: leaks, flashing, downspouts
  • Windows and doors: seals, hardware, condensation
  • Interior finishes: drywall cracks, paint, flooring
  • Kitchen and baths: plumbing leaks, cabinets, appliances
  • HVAC: airflow, filters, thermostat, condensation lines
  • Electrical: outlets, switches, GFCI, fixtures
  • Attic and basement/crawl: moisture, insulation, pests
  • Photograph every item; note room and date
  • Submit claim packet before the 1-year expiry

Building Closeout for this job

Closeout (working name) is the new-construction punch-list app behind this calculator — photograph defects, pin them on a floor plan, and hit every warranty deadline before coverage expires.

“Email me” opens your mail app with a short note to hello@northstave.app. No mailing list signup.